top of page
Baker Article-EMU Strong Hall_Page_1.jpg

EMU Strong Hall Revitalization Featured

 

Baker Construction Company was recently featured in the April 2019 issue of CAM Magazine.​   Download the Article

Eastern Michigan University’s $40 million renovation & addition to the historic Strong Hall was recently completed in January of 2019. Baker took on the unusual challenge of a design-assist build to accomplish both the various renovations and new 20,000 square foot addition. "They were instrumental in the design of added collaboration rooms into the existing brick structure, resulting in a better safer, and more cost effective project." CAM 2019

To integrate with the design of Sill Hall, which was originally built in 1957, a combination of brick, aluminum, limestone, and glass curtain wall were used to keep the overall design element while providing both energy efficiency and durability.

 

 

New Dearborn Rail Station Featured

 

Baker construction company was recently featured in the April 2014 CAM Magazine.​     Download the Article

Piecing Together an Amazing Intermodal Station: Dearborn’s new Intermodal Passenger Rail Station is a stunning, load-bearing masonry building.  "Clearly, Baker delivered the Holy Grail of construction: Quality work produced on schedule and on budget." CAM 2014

 

Baker arrived on site in early April 2013 and reached substantial completion in october 2013.  The mason’s craft is clearly displayed in every unit of brick, block and stone blanketing a building that dominates seven acres of land along Michigan Avenue.  Baker Construction hand-laid 133,500 modular bricks supplied by Belden Brick Sales Co., Fraser, said Baker Project Manager T.C. Baker. Twenty-one precast brick arches add to the character of this masonry show piece.

 

Built to last, this quality public building/monument is sure to become a part of Michigan’s economic development story and Baker Construction’s own history.  The entire region is excited about this new development rising on the edge of West Dearborn. 

The new “Crown Jewel” of Siena Heights University

 

Baker construction company was recently featured in the Fall 2013 magazine for alumni and friends of Siena Heights University.                             Download the Article

 

The new $9.1 million McLaughlin University Center was dedicated Oct. 5 as part of the Homecoming celebration.  The 34,000 square-foot student and community facility houses the University’s dining service, which includes a Mongolian-style grill, a snack shop featuring Starbucks coffee and the Barnes & Noble College Bookstore. 

 

"It's a building where students are meant to be."

 

Baker Construction Featured in        Ann Arbor Book

 

Dale Fisher has numerous publications featuring Ann Arbor where he has artistically documented the many changes that have taken place over 54 years, typically from the birds-eye view of a helicopter.  Download the Article

 

Baker was featured in this latest "Visions of the Eagle III".  The University of Michigan's Willard Dow Chemistry Building including inside atrium was one of Baker's most intricate and challenging projects.  Other of the over 45 UofM projects Baker has performed include the brick perimeter fence surrounding the University's football stadium and brickwork around the famed field.

 

Baker has performed work for Eastern Michigan University as well.

 

The University of Michigan's Willard H. Dow Laboratory (Chemistry Building)

The University of Michigan's Football Stadium

Baker Construction Company  810-231-6913

bottom of page